Bill Pleasants Power System
Propane and gasoline powered generators not shown automatically start up to restore power drawn from the batteries.
Solar panels and wind turbines could be used for charging batteries although here, charging is by commercial power.
Very big batteries are usually the most visually dramatic part of an on-site power system.
Multi-sensing control units are selected and programmed to meet specific requirements.
Bill can explain how systems are designed to serve independent backup and standby needs.
In earlier professional career work with Westinghouse as an electrical control systems engineer, Bill designed automated controls for complex electromechanical and robotic devices.
Bill Pleasants Power System
770 718 9696 10 a.m. to 4 p.m. Eastern time zone please
Web work by TimesMedia